In this short article I will certainly explain the common basic demands of an audio, contemporary high pressure, horizontal installation. The following description associates to a modern-day high pressure (400/600Kpa) system normally made by Kwikot South Africa.

geyser installationgeyser installation


Much less common are old reduced pressure systems (100kpa) open pipeline or "Latco" type systems. Realize that the components are NOT interchangeable in between both distinct systems - High stress and also Reduced pressure! It is feasible to remove an old reduced stress system and change it with a modern-day high stress system nevertheless - you buy a new high pressure hot spring and install it according to the existing spec.



The hot spring rests in a tray made of plastic (frequently red) or tin plate. I choose the plastic ones.

Considering that June 2001, the drip tray is not optional - its obtained to be there and there has to be a drainpipe pipeline for it! The drainpipe is a 50mm PVC waste pipeline that drains pipes the tray by piping the water out the residence (geyser installation).

Geyser Installation for Dummies

The 2 vacuum breakers stand vertically about 30cm above the hot spring. These are crucial, as they stop water siphoning out the geyser when the cold supply is stopped - geyser installation.

It can be said that this is the main feature, but I do not see it. Remember that vacuum breakers are a reasonably new requirement - there are still hundreds of old HP systems available without vacuum breakers and also I am yet to see one collapse. Just because I have not seen it doesn't suggest it's not taking place nevertheless! It is also most likely to take place in a multi-story building due to the fact that the siphon can draw a more powerful vacuum.

The chilly water side is the side that directly attaches to the drainpipe cock and gets in the geyser near the bottom. After the closed off shutoff you would typically discover a Stress Control Shutoff (PCV). There are a number of different kinds, mostly made of brass yet some are made of plastic.

This is where the PCV releases pressure and this is the pipe that often leaks. Do not panic if you can not locate the PCV following to the geyser - it might be totaled 10 metres away, commonly in a much more available position on a wall outside. Sometimes it's in a little plastic box outside.

Top Guidelines Of Geyser Installation

This is an essential part that must never ever be messed with or 'repaired'. This valve must have a reference metal (copper or steel) pipe linked to it and the pipe have to lead straight out the building. This vent pipe is a vital safety attribute of the entire system. It should be made from copper or steel - plastic.

The T&P valve is the least optional element - it has to exist! - The weight of the hot spring should be appropriately sustained on the roofing system trusses this page - a minimum of 2 supports under the 'feet' of the hot spring. If it looks shaky obtain a plumbing technician to examine it out.

This was not a demand on old hot springs, but it is now and also it deserves fitting one. The hot spring has to be earthed! I have actually seen numerous hot springs with the earth cable unconnected. All the copper pipes should additionally be earthed and bonded to the hot spring earth. This is not a minor precaution! Get a qualified electrical expert to check your installment if the bonding is missing or looks dodgy.


Again, these are commonly just left lying following to the hot spring. There are essentially only 2 primary thermostat kinds - the modern-day round "Kwiktherm" in newer Kwikot hot springs see this here and also the VK (rectangular block) key in older hot springs as well as in some more recent non-Kwikot devices. The geyser might be fed (chilly water) with polcop (plastic) pipeline - up to the turned off shutoff, yet the pipe into and also out of the hot spring must be copper or galvanized steel.

More About Geyser Installation

geyser installationgeyser installation


The warm water side need to be copper, steel or accordingly rated (70) plastic or composite pipeline. Note that you must contend the very least 1m of copper/steel pipeline out the hot spring - you might not attach plastic (compound) pipeline straight to the geyser. As above, the PCV and also T&P need to be made from copper or steel - particularly the vent out of the T&P shutoff.

geyser installationgeyser installation


I have seen a number of installations where the installer has just run a short size of 22mm copper into the drip tray with the idea being that the T&P can vent directly right into the drip tray. A suggestion because the hot (100 +) water/steam melts the drip tray and also the PVC drainpipe pipe.

The PCV is commonly over the hot spring and the cold water flows down into the hot spring. This is rather crucial due to the fact that it develops an anti-syphon loop that stops the geyser from draining pipes back via the inlet in case of a water system failure. If you fume water coming out your cool taps when the water system falls short then this is not working appropriately.